Asset report

Pilar gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Current (2017) production is from the Pilar and Maria Lazara underground mines. Ore is treated at the 1.45Mt/a capacity Pilar plant. The accompanying analysis assumes that production form the Tres Buracao open pit deposit will start in 2019 increasing annual production to over 100koz.

What's included

This report contains

  • Document

    Pilar Project gold mine

    XLS 123.00 KB

  • Document

    Pilar gold mine

    PDF 527.99 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898