Asset Report
Podgorica alumina refinery
Report summary
The Podgorica refinery was commissioned as the Titograd operation in 1972. It was put in operation to supply the adjacent smelter. The refinery has a nameplate capacity of 260ktpa and was supplied by bauxite from the RBN mine. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Bauxite
- Digestion
- Calcining
-
Environmental
- Red Mud
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: