Asset Report

Pomorzany-Olkusz zinc mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The operations included the Pomorzany and Olkusz mines, the Olkusz mill. The mill produced a zinc concentrate, a lead concentrate and from May 1997, a high grade zinc "bulk" concentrate has been produced as feed to the ISF smelter Miasteczo Slaskie. The zinc concentrate went to the integrated Boleslaw zinc smelter, a few kilometres away and the lead concentrate is exported. The mine closed at the end of 2020. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Emissions
  • Mining
  • Process

Tables and charts

This report includes 2 images and tables including:

  • Pomorzany-Olkusz Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Pomorzany-Olkusz zinc mine

    XLS 414.50 KB

  • Document

    Pomorzany-Olkusz zinc mine

    PDF 1.43 MB

  • Document

    Pomorzany-Olkusz zinc mine

    ZIP 1.02 MB