Asset Report
Ramu nickel operation
Report summary
Production commenced at the Ramu River nickel-cobalt mine in Q1 2012. The first shipment of mixed hydroxide product (MHP) into China occurred in November 2012. Ramu is currently the only HPAL plant operating consistently at above nameplate capacity. Production is predominantly shipped to China for final processing. MCC has recently constructed a dedicated refinery to process part of the MHP from Ramu at Caofeidian.
Table of contents
- Emissions
- Mining
- Process
- Cashflow
Tables and charts
This report includes 8 images and tables including:
- Ramu Emission Intensity Quartile Ranking - total global production - tonnes Ni equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Huayou Nickel Cobalt HPAL nickel operation
A detailed analysis of Huayue Nickel and Cobalt HPAL nickel operation
$2,250
Asset Report
Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project
A detailed analysis of the Black Swan / Silver Swan (inc. Cygnet) / Golden Swan nickel project.
$2,250
Asset Report
Avebury restart nickel operation
A detailed analysis of the Avebury restart nickel project.
$2,250