Report summary
Raura operates in 2018 an underground mine and a 2.77kt/d ore conventional concentrator. The concentrator usually operates 341 days per year. The life of the mine was extended from 2030 to 2037 because the 2018 resources were increased significantly. To extend the life of the mine, Raura has started in 2018 a deepening project of the mine that will last until 2022. The copper, lead and most of the zinc concentrate produced are shipped through the El Callao port in Lima. Some zinc concentrate is treated at Cajamarquilla.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Processing
- Royalties and taxes
Tables and charts
This report includes 2 images and tables including:
- Raura Emission Intensity Quartile Ranking – total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Martin Restart zinc mine project
A detailed analysis along the production and comercialisation chain of the San Martin Restart zinc mine project
$2,250
Asset Report
Mount Isa Pb_Zn section zinc mine
A detailed analysis of the Mount Isa Pb_Zn section zinc mine.
$2,250
Asset Report
Taxco Restart zinc mine
A detailed analysis along the production and commercialisation chain of the Taxco Restart zinc mine project
$2,250