Asset Report
Relincho (Closed) copper mine project
Report summary
This asset report refers to Teck's Relincho copper project before it was combined with El Morro in 2015 to form the NuevaUnion project. The new project is a 50:50 JV between Teck and Goldcorp in the Atacama region of Chile. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Power
- Water
- CAPEX
- Mining
- Process
- Royalties
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
El Morro (Closed) copper mine project
A detailed analysis of the El Morro copper mine project.
$2,250
Asset Report
Constellation (Closed) copper mine project
A detailed analysis of the Constellation copper mine project
$2,250
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250