Asset Report
Ridder (Leninogorsk) zinc mine
Report summary
All mines and tailings retreatment supply the centralised Ridder concentrator producing separate copper, lead and zinc concentrates and a gravity precious metals concentrate. Zinc concentrates are treated at the Ridder smelter, lead and copper concentrates are transported to Ust-Kamenogorsk. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset
Table of contents
- Summary
- Key Issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Ridder (Leninogorsk) Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ridder (Leninogorsk) copper mine
A detailed analysis of the Ridder (Leninogorsk) copper mine.
$2,250
Asset Report
Ridder (Leninogorsk) gold mine
A detailed analysis of the Ridder (Leninogorsk) gold mine.
$2,250
Asset Report
Leninogorsk (Ridder) zinc smelter
A detailed analysis of the Leninogorsk (Ridder) zinc smelter.
$2,250