Asset Report
Rosemont copper mine project
Report summary
The accompanying analysis considers an open pit project to recover copper with by-product molybdenum and silver from a conventional mining and concentrator operation. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- CAPEX
- Mining
- Processing
Tables and charts
This report includes 2 images and tables including:
- Rosemont Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
- Detailed Location
What's included
This report contains:
Other reports you may be interested in
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Yellowhead copper mine project
A detailed analysis of the Yellowhead copper mine project.
$2,250
Asset Report
Black Butte copper mine project
A detailed analysis of the Black Butte copper mine project.
$2,250