Asset report

Round Mountain gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Round Mountain is an open pit operation that utilises conventional mining methods. Ore is processed by gravity concentration or heap leaching (reusable and dedicated pads) depending on mineralogy and grade. In 2016, the mine produced 378koz of Au(eq) at total cash cost plus sustaining cost (TCPS) of US$1,047/oz. Kinross believes there is considerable upside potential at Round Mountain, and has identified near-term as well as long-term opportunities and targets to pursue.The accompanying analysis models the planned pushback of the existing open-pit to extend mine life by 5 years (Phase W expansion), with construction of a new heap leach pad and carbon in column (CIC) circuit at the processing plant. Phase W will require two years of waste stripping to access a 77.6Mt portion of of ore. Waste stripping is expected to commence in 2018, while construction of leach pads and associated infrastructure is expected to be completed by H2 2019.

What's included

This report contains

  • Document

    Round Mountain gold mine

    PDF 598.83 KB

  • Document

    Round Mountain gold mine.xls

    XLS 369.00 KB

Table of contents

Tables and charts

This report includes 12 images and tables including:

Images

  • Location maps: Image 1
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Economic assumptions: Table 1
  • Production: Table 1
  • Operations
  • Costs: Table 1
  • Cash costs (US$/oz)

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898