Asset Report

Sabodala-Massawa gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Sabodala-Massawa is an open pit operation utilising conventional truck and shovel mining methods. The process plant currently (2020) comprises a conventional carbon-in-leach (CIL) circuit with a design capacity of 3.6Mt/a fresh ore and 4Mt/a with a mix of oxidised ore. As refractory ore is present for at least 50% of the reserves at Massawa a separate refractory ore treatment (ROT) plant using bacterial oxidation (BIOX) with a capacity of 1.2Mt/a is anticipated to be constructed parallel to the existing plant to allow for processing of refractory ore from 2023.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Mining
  • Processing

Tables and charts

This report includes 2 images and tables including:

  • Sabodala-Massawa Emission Intensity Quartile Ranking - total global production - tonnes Au equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Sabodala-Massawa gold mine

    XLS 131.00 KB

  • Document

    Sabodala-Massawa gold mine

    PDF 1.60 MB

  • Document

    Sabodala gold mine

    ZIP 988.53 KB