Asset report

San Felipe nickel project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The San Felipe deposit is thought to host 230Mt of ore grading 1.25% Ni and 0.10% Co. It is envisaged that the limonitic ores will be subjected to pressure acid leaching. Nickel and possibly cobalt would be recovered as finished metal on site.

What's included

This report contains

  • Document

    San Felipe Project - Cancelled nickel operation

    XLS 250.00 KB

  • Document

    San Felipe nickel project

    PDF 721.91 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898