Asset Report
San Manuel (closed) copper smelter
Report summary
The smelter was originally constructed in 1956 to treat green feed using one reverberatory furnace and three Peirce-Smith converters. During the late 1960s and early 1970s it was expanded to three reverberatory furnaces and six Peirce-Smith converters. In 1974 a double train single contact acid plant was built to process gases from the converters. The flash furnace was commissioned in July 1988 and the acid plant was converted to a double contact plant. The reverberatory furnaces finally...
Table of contents
- Flowsheet
- Smelting process
- Auxiliary plants
- Environmental
Tables and charts
This report includes 4 images and tables including:
What's included
This report contains:
Other reports you may be interested in
Asset Report
Alaska (closed) copper smelter
A detailed analysis of the Alaska copper smelter.
$2,250
Asset Report
Copper Cliff (closed) copper smelter
A detailed analysis of the Copper Cliff copper smelter.
$2,250
Asset Report
La Oroya (closed) copper smelter
A detailed analysis of the La Oroya copper smelter.
$2,250