San Nicolas is planned to be operated through an open pit feeding a conventional flotation plant to produce zinc and copper concentrates. The decision to proceed is to be largely based on economics relating to the zinc price and Teck Resources’ requirement for zinc or zinc concentrate. The shown start-up date of 2023 is speculative at best. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Emissions
- Detailed map
- Mining
- Processing
- CAPEX
- Royalties and taxes
Tables and charts
This report includes 3 images and tables including:
- San Nicolas Emission Intensity Quartile ranking – total global production - tonnes Zn equivalent
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Nicolas copper mine project
A detailed analysis of the San Nicolas copper mine project.
$2,250
Asset Report
San Martin Restart zinc mine project
A detailed analysis along the production and comercialisation chain of the San Martin Restart zinc mine project
$2,250
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250