Asset Report
Selwyn (Starra) copper mine
Report summary
The mine operated between 1988 and 2003. Surface infrastructure was subsequently acquired by Ivanhoe Australia and analysis has been incorporated into the accompanying Osborne analysis. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Selwyn (Starra) (Closed) gold mine
A detailed analysis of the Selwyn (Starra) gold mine.
$2,250
Asset Report
Carmacks SxEw copper mine project
A detailed analysis of the Carmacks SxEw copper mine project.
$2,250
Asset Report
Mount Isa copper mine
A detailed analysis of the Mount Isa copper mine.
$2,250