The Shanli smelter was founded in 1988 with an initial zinc smelting capacity of 40kt/a. In 2006, the smelter built a new 60kt/a capacity to raise the total smelting capacity to 100kt/a slab zinc. However, the commissioning of this expansion project was delayed until 2016 due to a series of issues. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues

Tables and charts

This report includes 6 images and tables including:

  • Feed Preparation
  • Roaster and Acid Plant
  • Leaching and Purification
  • Tankhouse, Melting and Casting