Asset Report
Snow Lake gold (closed) mine
Report summary
The Snow Lake mine previously operated until 2005 when it was shut. Hudbay acquired the mine and mill in 2015 for US$11 million and an additional US$5 million contingent payment. The plan was to refurbish the mine to treat the gold-rich zone at Lalor Mine. A feasibility study on the project was completed in early 2017. For production and cost estimates from the plant, please see the Lalor Lake profile.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: