Asset report

Garfield copper smelter

From

$1,350.00

You can pay by card or invoice

Get this report

From

$1,350.00

You can pay by card or invoice

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Smelting has taken place on the site of the existing smelter since 1906. During 1974-1978 a major modification involved the replacement of the green feed reverberatory furnaces with Noranda reactors. The plant was closed from mid-1985 to June 1987 due to closure of the Bingham mining operations and a new anode casting system was installed prior to re-opening. Acid was first produced at the smelter in 1916 and, since 1937, nine "modern" contact acid plants have been built. In addition a...

What's included

This report contains

  • Document

    Garfield copper smelter

    PDF 578.58 KB

  • Document

    Garfield copper smelter.xls

    XLS 475.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898