Asset Report

Sohar copper smelter

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The smelter was commissioned in 1983 as part of an integrated mine/mill/smelter/refinery project undertaken by the Government of the Sultanate of Oman. The smelter/refinery site is located 250km north-west of Muscat and 30km inland from the Gulf of Oman coast. At commissioning the capacity of the smelter was 20kt/a anode from concentrate from the integrated mines. However, the grade of the concentrate from these mines did not reach the design grade, which limited the smelter capacity to...

Table of contents

  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Environmental

Tables and charts

This report includes the following images and tables:

What's included

This report contains:

  • Document

    Sohar copper smelter

    PDF 1.10 MB