Sonshi Mareto Sodo iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
Tables and charts
This report includes the following images and tables:
-
Detailed mapParticipationMarketable reserves (at 01/01/2023)
-
ProductionProductionOperationsInfrastructureCash costsCash costsCapital costsProduct QualityEconomic assumptions
What's included
This report contains:
Other reports you may be interested in
Lebedinsky GOK iron ore mine
HBI production at Lebedinsky GOK's HBI-3 has exceeded full capacity, producing 4.6 Mt in both the last three years.
$2,250Sishen iron ore mine
Sishen's ultra-high dense media separation (UHDMS) plant will extend mine life to 2040, lower the strip ratio and improve product quality.
$2,250Simandou (Blocks 1 and 2) iron ore mine
Once operational, Chinese state-owned entities may hold and control 45% of the entire Simandou deposit.
$2,250