By the end of 2017 Sossego was operating three conventional open pits (Sossego, Sequerinho and Pista) and a 41kt/d flotation mill with single SAG feeding two ball mills. Based on current (Dec 2017) reserves, Vale estimates a mine life until 2027 but with stockpiles this could be extended one or two more years. However due to the strategic location of Sossego, close to Cristalino (45 km), the 118 mine deposit (less than 20km) and Visconde (15km), Vale believes that eventually sulphide ore from those mines will be treated in the Sossego mill. The status of this strategy was under feasibility study.
Table of contents
- Summary
- Key issues
- Power
- CAPEX
-
Operating
- Labour
- Mining
-
Processing
- Mill
- Bio Leach
- CESL
- Royalties and taxes
- Mineral concessions
- Permitting
- Environmental reclamation
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains: