Asset Report
South West Creek Hub iron ore project
Report summary
In April 2021, Brockman announced that Mineral Resources had satisfied obligations required to establish a JV with them to earn a 50% Farm-In Interest in both the Marillana and Ophthalmia projects. Together, these projects form the basis of the South West Creek Hub. MRL intends to establish the JV and immediately commence initial development works at the mine sites. After a long wait for allocation, MRL and Hancock have jointly been awarded a berth at Port Hedland, where they are currently conducting feasibility studies to develop the port.
Table of contents
- Capital Costs
Tables and charts
This report includes 3 images and tables including:
- Capital Costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
Asset Report
Utah Point Hub iron ore mine
Output from Wonmunna has ramped up quickly, allowing Iron Valley to be scaled back from blend. Lamb creek is next to be developed.
$2,250
Asset Report
Ashburton Hub iron ore mine
The ore production started at Ashburton Hub, putting the mine on schedule for shipment by June 2024.
$2,250
Asset Report
Yilgarn Hub iron ore mine
Mineral Resources will reduce production to 7Mt, extending mine life, as it investigates magnetite opportunities at Koolyanobbing.
$2,250