Asset Report

Sukhaybarat gold mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Operations resumed in 2014 having been suspended in 2012. Reserves are sufficient to support a mine life of up to at least 2031. The Sukhaybarat plant also treats loaded carbon from the Bulghah mine, located 65km away from the site. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Sukhaybarat gold mine

    XLS 144.00 KB

  • Document

    Sukhaybarat gold mine

    PDF 1.10 MB

  • Document

    Sukhaybarat gold mine

    ZIP 958.09 KB