Asset report

Sukhoi Log gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Sukhoi Log project is planned as an open pit operation utilising conventional bulk open pit methods. Low grade material could be stockpiled and processed at the end of the mine life. The process plant will comprise gravity concentration and flotation circuits and cyanidation of concentrates to recover gold. An initial plant throughput of 15Mt/a is modelled followed by a series of incremental expansions to 30Mt/a.

What's included

This report contains

  • Document

    Sukhoi Log Project gold mine

    XLS 128.50 KB

  • Document

    Sukhoi Log gold mine project

    PDF 813.32 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898