The Tan Rai mine was commissioned in 2012 to serve the Lam Dong refinery. The mine will have a final capacity of 1.6Mtpa. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Discovery Bay bauxite mine
A detailed analysis of the Discovery Bay bauxite mine.
$2,250
Asset Report
SMB-WAP bauxite mine
The SMB-WAP project started shipments of bauxite to China in H2 2015.
$2,250
Asset Report
Trombetas bauxite mine
A detailed analysis of the Trombetas bauxite mine.
$2,250