Asset Report
Nhan Co bauxite mine
Report summary
Vinacomin developed the 1.8Mtpa Nhan Co bauxite mine to serve its Nhan Co alumina refinery. The bauxite is mainly gibbsite with small boehmite and kaolinite fractions. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Nhan Co bauxite mine Emission Intensity Quartile Ranking - Total global production - Tonnes of bauxite
What's included
This report contains:
Other reports you may be interested in
Asset Report
Nhan Co alumina refinery
The refinery started production in 2017. It was the second such plant in Vietnam.
$2,250
Asset Report
Xihedi bauxite mine
A detailed analysis of the Xihedi bauxite mine.
$2,250
Asset Report
Mianchi bauxite mine
A detailed analysis of the Mianchi bauxite mine.
$2,250