Asset Report

Tarkwa gold mine

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

19 May 2021

Tarkwa gold mine

Report summary

Tarkwa is an open-pit operation with mining by contractors at four deposits. The processing plant comprises a conventional carbon-in-leach (CIL) circuit that was expanded in 2014 to a capacity of 13.5Mt/a. This increased to 14.0Mt/a in 2020. An optimisation program is ongoing at the mine and mill to improve efficiency and reduce operating costs. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Tarkwa gold mine

    XLS 141.50 KB

  • Document

    Tarkwa gold mine

    PDF 1.13 MB

  • Document

    Tarkwa gold mine

    ZIP 1.11 MB

  • Document

    Tka_flex.xlsx

    XLSX 392.59 KB