Asset report

Tongling Panlong zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The mine commenced ore production in 2001 with a nominal capacity of 1kt/d. Prior to the commissioning of the 1kt/d mill in 2006 all ore mined was sold to concentrators in the local area. Capacity was increased incrementally to 1.5kt/d by 2011. A new mill was commissioned at the end of 2012 with a capacity of 3kt/d and the original mill was shut down. A further expansion to 8kt/d was planned for 2015.

What's included

This report contains

  • Document

    Tongling Panlong zinc mine

    XLS 572.00 KB

  • Document

    Tongling Panlong zinc mine

    PDF 569.52 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898