Asset report

Tongling Panlong zinc mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The mine commenced ore production in 2001, with a nominal capacity of 1kt/d. Prior to the commissioning of the 1kt/d mill in 2006, all ore mined was sold to concentrators in the local area. Capacity was increased incrementally to 1.5kt/d by 2011. A new mill was commissioned at the end of 2012 with a capacity of 3kt/d and the original mill was shut down. A further expansion to 8kt/d was planned for 2015.

What's included

This report contains

  • Document

    Tongling Panlong zinc mine

    XLS 572.00 KB

  • Document

    Tongling Panlong zinc mine

    PDF 569.52 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898