Asset Report
Tongling Panlong zinc mine
Report summary
The mine commenced ore production in 2001, with a nominal capacity of 1kt/d. Prior to the commissioning of the 1kt/d mill in 2006, all ore mined was sold to concentrators in the local area. Capacity was increased incrementally to 1.5kt/d by 2011. A new mill was commissioned at the end of 2012 with a capacity of 3kt/d and the original mill was shut down. Construction for a further expansion to 6kt/d has started in 2019.
Table of contents
- Summary
- Key Issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
San Valentin zinc mine
A detailed production and cost competitive analysis of the Valentin zinc mine.
$2,250
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,250
Asset Report
Pomorzany-Olkusz zinc mine
A detailed analysis of the Pomorzany-Olkusz zinc mine.
$2,250