Asset Report
Tongsheng zinc smelter
Report summary
The Tongsheng zinc smelter in Turpan in Xinjiang, China uses pressure leaching technology and was commissioned in 2013. With Phase I of project completed, the smelter currently has a slab zinc production capacity of 20kt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
Tables and charts
This report includes 7 images and tables including:
- Detailed map
- Flowsheet
- Feed Preparation
- Roaster and Acid Plant
- Leaching and Purification
- Tankhouse, Melting and Casting
What's included
This report contains: