Asset report

Toromocho copper mine

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

This is a conventional open pit mine and concentrator that under normal operating conditions is to produce copper concentrates and moly trioxide in the hydromet plant. On 16th January 2014 Toromocho commissioned a mine mill of 117.2kt/d ore. However in 2016 the concentrator capacity was revised down to 100kt/d. Total milled ore in 2016 was 35.13 Mt ore with 0.67%Cu to get 931.9 kt copper concentrate with 18.07%Cu and 0.73%As.

What's included

This report contains

  • Document

    Toromocho copper mine

    PDF 568.97 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898