Asset Report

Tres Marias zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Tres Marias zinc smelter

Report summary

The Tres Marias Smelter was built to treat the oxide/silicate concentrate from the wholly owned Vazante open pit mines (calamine).  Production commenced in 1969 with a capacity of 10kt/a.  In the late 1980s a new pressure filtration plant for leach residues, engineered by Bokola, was installed to improve leach extraction.  By several expansions capacity had reached 80kt/a by 1993.  Reserves at the Vazante mine have gradually been depleted and it has now become necessary to mine underground,...

Table of contents

  • Key facts
  • Summary and key issues
  • Projects
  • Location maps
  • Participation
    • Other
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Participation: Table 1
  • Flowsheet
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Image 1
  • Products: Table 1
  • Products: Table 2
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Tres Marias zinc smelter

    PDF 807.68 KB

  • Document

    Tres Marias zinc smelter.xls

    XLS 522.50 KB

Other reports you may be interested in

Browse reports by Industry Sector