Asset Report
Vatukoula gold mine
Report summary
Vatukoula mine having previously been an open pit and underground operation is now only an underground mine (open pit mining was completed in 2012). Mining methods utilised are shrinkage stoping, long wall panel mining and cut-and-fill. The process plant is comprised of a carbon-in-pulp (CIP) circuit. The Company were exploring alternative mining methods in order to bring down the operational cost of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
06 December 2022
Rainy River gold mine project
Asset Report
Rainy River gold mine project
A detailed analysis of the Rainy River gold mine project.
$2,25017 April 2023
Olimpiada gold mine
Asset Report
Olimpiada gold mine
A detailed analysis of the Olimpiada gold mine.
$2,25006 December 2022
Bonikro gold mine
Asset Report
Bonikro gold mine
A detailed analysis of the Bonikro gold mine.
$2,250