Asset report

Verninskoye gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The mine was commissioned in December 2011. Verninskoye is an open pit operation and the processing plant utilises gravity flotation and carbon in leach methods with a design capacity of 2.2Mt/a.

What's included

This report contains

  • Document

    Verninskoye gold mine

    XLS 134.00 KB

  • Document

    Verninskoye gold mine

    PDF 810.25 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898