Wakayama steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Iron ore
- Coal
- Coke
- Metallics
-
Energy
- Downstream products
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed map
- Total operating cash costs - Finished steel
- Finished steel production
What's included
This report contains:
Other reports you may be interested in
2025 tight oil costs: tariffs, trade and oil price turmoil
Tariffs, lower oil prices, shifting activity levels - what does it all mean for Lower 48 well costs?
$1,350Nam Con Son Pipeline
The Nam Con Son Pipeline is a two-phase pipeline running from Block 06-1 to the Phy My power and industrial complex in south Vietnam.
$2,580Troll
The giant Troll field is located in the Northern North Sea, 65 kilometres west of Kollness.
$5,280