Wakayama steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key issues
- Participation
- Iron ore
- Coal
- Coke
- Metallics
-
Energy
- Downstream products
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed mapFinished steel cost (US$/tonne)
-
Operation cash costs table (US$/tonne)Economic assumptionsFinal steel production (Mt)Production table (Mtpa)
What's included
This report contains:
Other reports you may be interested in
Mikhailovsky GOK iron ore mine
Upgrades at MGOK has enabled pellet capacity to expand to 14 Mtpa and there is potential for further increases in pellet production.
$2,250Los Pelambres copper mine
A detailed analysis of the Los Pelambres copper mine.
$2,250Xinjiang Qiya aluminium smelter
A detailed analysis of the Xinjiang Qiya aluminium smelter.
$2,250