Asset Report
Warrawoona gold mine project
Report summary
The Warrawoona Gold Project located in the Pilbara Goldfield of Western Australia, is an open pit and underground operation, that is expected to commence production by 2022. The project is owned by Calidus Resources, is fully funded and under construction. The Feasibility Study released in September 2020, envisaged an ~8 year mine, with total gold production of 658koz. In September 2020, Calidus also acquired the high-grade Blue Spec Gold/ Antimony Project, located 70km from Warrawoona mill, with the intention to integrate the project with Warrawoona.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
- Power
Tables and charts
This report includes 1 images and tables including:
- Detailed Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Horne 5 gold mine project
A detailed analysis of the Horne 5 gold mine project
$2,250
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Tocantinzinho gold mine project
A detailed analysis of the Tocantinzinho gold mine project.
$2,250