Asset Report

Warrawoona gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Warrawoona Gold Project located in the Pilbara Goldfield of Western Australia, is an open pit and underground operation, that is expected to commence production by 2022. The project is owned by Calidus Resources, is fully funded and under construction. The Feasibility Study released in September 2020, envisaged an ~8 year mine, with total gold production of 658koz. In September 2020, Calidus also acquired the high-grade Blue Spec Gold/ Antimony Project, located 70km from Warrawoona mill, with the intention to integrate the project with Warrawoona.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX
  • Power

Tables and charts

This report includes 1 images and tables including:

  • Detailed Map

What's included

This report contains:

  • Document

    Warrawoona gold mine project.xls

    XLS 115.00 KB

  • Document

    Warrawoona gold mine project

    PDF 1.06 MB