Willowdale was commissioned in 1984 and is the smaller of the two remaining mine sites in Alcoa's Darling Range operations.Capacity is about 9Mtpa. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Process
Tables and charts
This report includes 2 images and tables including:
- Willowdale Emission Intensity Quartile Ranking - Total global production - Tonnes of bauxite
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Discovery Bay bauxite mine
A detailed analysis of the Discovery Bay bauxite mine.
$2,250
Asset Report
SMB-WAP bauxite mine
The SMB-WAP project started shipments of bauxite to China in H2 2015.
$2,250
Asset Report
Trombetas bauxite mine
A detailed analysis of the Trombetas bauxite mine.
$2,250