Asset Report

Willowdale bauxite mine

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Willowdale was commissioned in 1984 and is the smaller of the two remaining mine sites in Alcoa's Darling Range operations.Capacity is about 9Mtpa. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
  • Mining
  • Process

Tables and charts

This report includes 2 images and tables including:

  • Willowdale Emission Intensity Quartile Ranking - Total global production - Tonnes of bauxite
  • Detailed map

What's included

This report contains:

  • Document

    Willowdale bauxite mine

    XLS 87.50 KB

  • Document

    Willowdale bauxite mine

    PDF 1.54 MB

  • Document

    Willowdale bauxite mine

    ZIP 940.51 KB