Asset report

Xian zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The original smelter was a 15kt/a unit at Mei Xian 150km west of Xi'an. Construction of a larger plant of 35kt/a capacity the Xian smelter commenced in 1998. This operation was commissioned in June 2002 and was situated in the southern suburbs of Xi'an. Production never reached the 35kt/a level and this allied to its urban location lead to the smelter being closed in 2013.

What's included

This report contains

  • Document

    Xian zinc smelter

    PDF 542.63 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898