Asset report

Xian zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

  • An error has occurred while getting captcha image

Report summary

The original smelter was a 15kt/a unit at Mei Xian, 150km west of Xi'an. Construction of a larger plant of 35kt/a capacity, the Xian smelter, commenced in 1998. This operation was commissioned in June 2002 and was situated in the southern suburbs of Xi'an. Production never reached the 35kt/a level, and this allied to its urban location lead to the smelter being closed in 2013.

What's included

This report contains

  • Document

    Xian zinc smelter

    PDF 542.63 KB

Table of contents

  • Key facts
    • Summary
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline

Tables and charts

This report includes 3 images and tables including:


  • Location maps: Image 1
  • Flowsheet


  • Key facts: Table 1

You may be interested in


Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898