Asset Report

Mian Xian (Bayi) zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Mian Xian (Bayi) zinc smelter

Report summary

Zinc smelting commenced in 1999 with a capacity of 7kt/a slab zinc. The smelter processed calcine produced on redundant equipment at the Bayi copper mine. The first fluid bed roaster was built at Mian Xian in 2000 and the tankhouse was expanded to provide a total capacity of 25kt/a slab zinc.  Further expansions have taken the plant capacity to 330kt/a slab zinc. These included the building of a twin zinc smelter adjacent to the original in 2008.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Flowsheet
  • Feed preparation
  • Roaster & Acid plant
  • Leaching & Purification
  • Tankhouse, melting & Casting
  • Production
  • Products: Table 1
  • Products
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Mian Xian (Bayi) zinc smelter

    PDF 1.02 MB

  • Document

    Mian Xian (Bayi) zinc smelter.xls

    XLS 452.50 KB

Other reports you may be interested in

Browse reports by Industry Sector