Asset report

Xiangfen zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The plant was established in 1997. Electrolytic zinc production commenced in 2001, treating calcine produced in a converted pyrites roaster. Capacity was 26kt/a slab zinc, but this rose to 90kt/a in 2003. In 2008 & 2009, production was severely reduced due to poor market conditions and a government order to stop production during the Beijing Olympic Games. Since then there was some operation in 2012, but this plant is now assumed closed.

What's included

This report contains

  • Document

    Xiangfen (Electrolytic) closed zinc smelter

    XLS 269.00 KB

  • Document

    Xiangfen zinc smelter

    PDF 815.83 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
    • Other
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898