Asset report

Xiangfen (Electric) zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The electric furnace plant known as the thermal plant shared its site with the Xiangfen electrolytic zinc smelter. Capacity was originally 6kt/a but this was raised to 25kt/a in 2002.In 2009 the site was ordered to stop production during the Beijing Olympic Games. Since then there has been little production form either plant with the electric furnace plant last reported producing crude zinc in 2012. It is therefore assumed that this smelter is now closed.

What's included

This report contains

  • Document

    Xiangfen (Electric) zinc smelter

    PDF 797.78 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Projects
  • Process overview
  • Products
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Zawar zinc mine

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898