Asset report

Xiangfen zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The plant was established in 1997. Electrolytic zinc production commenced in 2001 treating calcine produced in a converted pyrites roaster. Capacity was 26kt/a slab zinc but this rose to 90kt/a in 2003. In 2008 & 2009 production was severely reduced due to poor market conditions and a government order to stop production during the Beijing Olympic Games. Since then there was some operation in 2012 but this plant is now assumed closed.

What's included

This report contains

  • Document

    Xiangfen (Electrolytic) closed zinc smelter

    XLS 269.00 KB

  • Document

    Xiangfen zinc smelter

    PDF 815.83 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898