Asset Report
Xuanhua steel plant
Report summary
Hebei Iron and Steel Group received approval in March 2017 to relocate Xuanhua to Tangshan Leting. After the relocation, Xuanhua will have 7.3 Mtpa iron making capacity and 7.5 Mtpa steelmaking capacity, targeting to produce 4.1 Mtpa flat and 3 Mtpa long steel products. Xuanhua's relocation is part of Hebei Iron and Steel's capacity restructuring project. In September 2021, all blast furnaces of Xuanhua Iron and Steel have been suspended entirely.
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital Cost
- Operating cash costs
Tables and charts
This report includes 11 images and tables including:
- Detailed Map
- Participation
- Steel plant overview
- Finished steel production
- Total operating cash costs-Finished steel
What's included
This report contains:
Other reports you may be interested in
Asset Report
PT Virtue Dragon nickel operation
Cost analysis of Virtue Dragon NPI plant, Indonesia
$2,250
Asset Report
Girilambone SxEw copper mine
A detailed analysis of the Girilambone SxEw copper mine.
$2,250
Asset Report
Mt Garnet (Copper Plant) copper mine
A detailed analysis of the Mt Garnet (Copper Plant) copper mine.
$2,250