Asset report

Xuanhua steel plant

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Hebei Iron and Steel Group received approval in March 2017 to relocate Xuanhua to Tangshan Leting. After the relocation is finished in 2021 Xuanhua will have 7.3 Mtpa iron making capacity and 7.5 Mtpa steelmaking capacity targeting to produce 4.1 Mtpa flat and 3 Mtpa long steel products. Xuanhua's relocation is part of Hebei Iron and Steel's capacity restructuring project. The previous Xuanhua steel complex will completely close down after the relocation.

What's included

This report contains

  • Document

    Xuanhua steel plant

    PDF 319.39 KB

  • Document

    Xuanhua.xls

    XLS 336.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Raw materials
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 12 images and tables including:

Images

  • Detailed Map
  • Finished steel production
  • Total operating cash costs-Finished steel

Tables

  • Key facts: Table 1
  • Participation
  • Steel plant overview
  • Products: Table 1
  • Products: Table 2
  • Economic assumptions: Table 1
  • Costs: Table 1
  • Costs: Table 2

You may be interested in?

Asset report

Anshan steel plant

Asset report

Baotou steel plant

Asset report

Benxi steel plant

    
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898