Xuanhua steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key issues
- Iron ore
- Coal
- Coke
- Metallics
- Energy
- Capital Cost
- Operating cash costs
Tables and charts
This report includes the following images and tables:
- Detailed Map
- Participation
- Steel plant overview
- Finished steel production
- Total operating cash costs-Finished steel
What's included
This report contains:
Other reports you may be interested in
Doropo mine
A detailed analysis of the Doropo mine
$2,250El Aouj iron ore mine
A feasibility study for Stage 1 of the 11 Mtpa El Aouj deposit was completed at the end of 2015; the mine will start operating in Q1 2027.
$2,250Mount Holly aluminium smelter
A detailed analysis of the Mount Holly aluminium smelter.
$2,250