Asset Report
Yanlong-Lindai bauxite mine
Report summary
There are two mining areas, Yanlong and Lindai (which along with Changchonghe and Maiba forms Guizhou #2). The mines are captive suppliers to the Guizhou refinery. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Changchonghe bauxite mine
A detailed analysis of the Changchonghe bauxite mine.
$2,250
Asset Report
Bauxite Hills bauxite mine
After the completion of the Metro Mining Ltd. takeover of Gulf Alumina Ltd. in late 2016, combined reserves reached 96Mt of bauxite ore.
$2,250
Asset Report
Maiba bauxite mine
A detailed analysis of the Maiba bauxite mine.
$2,250