Asset report

Young-Davidson gold mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Young Davidson was initially mined as a combined open pit and underground mining operation until June 2014 when open pit mining ceased. Underground ore and stockpiled open pit ore is processed in a 8kt/d carbon-in-leach circuit to produce gold dore.In 2016, the mine produced 170koz of gold from processing a blend of underground and stockpiled ore. Ore production is now solely from underground sources and the mine is expected to produce 200-210koz of gold in 2017.Underground development is ongoing to ramp-up ore production from 6kt/d in 2016 to7.5kt/d by 2017, and 8kt/d over the next three years.

What's included

This report contains

  • Document

    Young-Davidson gold mine

    PDF 474.71 KB

  • Document

    Young-Davidson gold mine

    XLS 121.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
    • Mining
    • Processing
    • Power
    • CAPEX
  • Timeline

Tables and charts

This report includes 2 images and tables including:


  • Location maps: Image 1


  • Key facts: Table 1

You may be interested in


Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898