Asset Report
Zhaofeng aluminium smelter
Report summary
Zhaofeng consisted of two plants, which we cost as a single entity. Plant 1 (63kt/a) was permanently closed in early 2013. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Detailed map
- Alumina Sources
-
Anode Source
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 1 images and tables including:
What's included
This report contains: