North America levelized cost of electricity (LCOE) 2023
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
La Caridad copper smelter
A detailed analysis of the La Caridad copper smelter.
$2,250North America levelised cost of electricity 2023 (LCOE)
This annual report provides analysis of power technology and generation cost trends in the United States.
$15,000Global aluminium smelter asset cost summary
The Global Aluminium Asset Summary examines the cost environment in the base year as well as historically and forward five years.
$6,750