African FLNG floats into contention: Pre-FID upstream project tracker Q1 2017

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

2017 is off to a strong start for sanctions, with three deepwater projects - Mad Dog Ph.2, Leviathan and Kaskias - already approved. Two further deepwater projects are strongly positioned for FID during the first half of 2017 - Coral FLNG in Mozambique and Block R FLNG offshore Equatorial Guinea. Use the Pre-FID upstream project tracker to follow the status of all major pre-FID projects worldwide.

What's included

This report contains

  • Document

    African FLNG floats into contention Pre-FID upstream project tracker Q1 2017.pdf

    PDF 145.15 KB

  • Document

    African FLNG floats into contention: Pre-FID upstream project tracker Q1 2017

    PDF 322.16 KB

  • Document

    African FLNG floats into contention: Pre-FID upstream project tracker Q1 2017

    ZIP 728.64 KB

  • Document

    African FLNG floats into contention Pre-FID upstream project tracker Q1 2017.xlsx

    XLSX 714.71 KB

Table of contents

  • African FLNG floats into contention: Pre-FID upstream project tracker Q1 2017

Tables and charts

This report includes 1 images and tables including:

Images

  • African FLNG floats into contention: Pre-FID upstream project tracker Q1 2017: Image 1

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898