Asset Report

Benoy

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Benoy oil development is located in the Doba basin of southern Chad. Overseas Petroleum and Investment Corporation (OPIC), a subsidiary of Taiwan's national oil company, CPC, is the operator. The development comprises four fields within the Chari Ouest III (BCO III) block: Benoy, Mbaikoro, Mouroumar and Benoy West. The Benoy field was discovered in 2011, with the three satellite fields subsequently discovered through further exploration on the acreage. Production from Benoy, Mbaikoro and Mouroumar fields started in 2020, with the first cargo arriving in Taiwan that year. The coronavirus pandemic delayed the startup of Benoy West, which came on stream in 2022. The field development is spread across two phases. Phase 1 focused on production start-up from all four fields, but due to capacity constraints, the combined total rate was limited to 10,000 b/d. Phase 2 started in 2024, increasing the processing capacity of the field complex to 20,000 b/d.

Table of contents

  • Summary
    • Phase 1
    • Phase 2
    • Further development
    • Capital costs
    • Operating costs
  • Cash flow
  • Global Economic Model (GEM) file name
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index mapBenoy development mapParticipation
    Field and hydrocarbon characteristicsKey E&A wellsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2016-2025)Production profileCash Flow (US$)PV Table (US$)Summary Table (US$)
  • 7 more item(s)...

What's included

This report contains:

  • Document

    Benoy

    PDF 2.31 MB