Bergen Concession
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Unitisation
- Key development metrics
- Underground Gas Storage
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
-
Cash Flow
- US$ million
- EUR million
Tables and charts
This report includes the following images and tables:
-
Index mapBergen Concession mapParticipation
-
Hydrocarbon and reservoir characteristicsDiscovery summaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Bergen Concession production profileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2034 ( million)Cash Flow (US$)
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Aguablanca restart nickel project
A detailed analysis of the Aguablanca restart nickel project.
$2,250G1/61 (Erawan)
The block G1/61 (Erawan), covering 4,378 km2, is located in the Gulf of Thailand. The G1/61 PSC, officially signed in 2019, was the ...
$3,720G10/48 (Wassana)
The G10/48 Concession contains the commercial Wassana discovery and two non-commercial finds, Mayura and Nirama.
$3,720