Asset Report

Bessemer/Beaufort/Bell

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Perenco-operated, Bessemer, Beaufort and Bell gas fields are located in block 49/23 of the Southern Gas Basin. Bessemer and Beaufort were developed using an Amoco Minimum Offshore Support Structure (AMOSS) platform tied-back to the Indefatigable 'AT' platform. Deviated wells targeted both field reservoirs. Beaufort ceased production in 2001, and Bessemer ceased in 2013.Bell is the only remaining producer and is expected to cease production in 2026. Gas is transported from the ...

Table of contents

  • Summary
    • No further development expected and decommissioning is underway
  • Bessemer and Beaufort
  • Bell (Perenco)
  • Capital costs
  • Decommissioning costs
  • Operating costs
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow
    • Bessemer
    • Bell (49/23)

Tables and charts

This report includes the following images and tables:

    Platform summaryPipeline summaryCapital Costs Pre-2018 to 2026 (US$ million)
    Capital Costs Pre-2026 to 2032 (US$ million)Operating Costs 2026 to 2030 (US$ million)Index mapBessemer/Beaufort/Bell mapParticipationField hydrocarbon characteristicsReserves (2P) at 01/01/2026Production (2009-2018)
  • 15 more item(s)...

What's included

This report contains:

  • Document

    Bessemer/Beaufort/Bell

    XLS 3.54 MB

  • Document

    Bessemer/Beaufort/Bell

    PDF 3.53 MB